jagomart
digital resources
picture1_Thermal Analysis Pdf 88090 | Peter Rachel Linear Programming And Critical Path Analysis


 339x       Filetype PDF       File size 0.76 MB       Source: sms.wgtn.ac.nz


File: Thermal Analysis Pdf 88090 | Peter Rachel Linear Programming And Critical Path Analysis
linear programming and critical path analysis peter mcclymont wgc rachel hunt vuw 3 2 linear programming secondary school wgc internally assessed standard at wgc it s only done in the ...

icon picture PDF Filetype PDF | Posted on 15 Sep 2022 | 4 years ago
Partial capture of text on file.
   Linear Programming  
   and  
   Critical Path Analysis 
   Peter McClymont - WGC 
   Rachel Hunt - VUW 
 3.2 Linear 
 Programming 
  Secondary School (WGC) 
  •Internally assessed standard 
  •At WGC it’s only done in the Stats B (internal) 
   course.  
  •12 Level 2 M&S credits needed to do this 
   course  
  •This standard requires no technology beyond a 
   graphics calculator for finding the intersection 
   of lines 
       Secondary School (WGC) 
       •Material covered: 
                                 - linear inequalities 
                                 - feasible regions 
                                 - optimisation 
      Achievement               Achievement with Merit      Achievement with Excellence 
        Apply linear              Apply linear programming    Apply linear programming 
        programming methods       methods, using relational   methods, using extended 
        in solving problems.      thinking, in solving        abstract thinking, in solving 
                                  problems.                   problems. 
The words contained in this file might help you see if this file matches what you are looking for:

...Linear programming and critical path analysis peter mcclymont wgc rachel hunt vuw secondary school internally assessed standard at it s only done in the stats b internal course level m credits needed to do this requires no technology beyond a graphics calculator for finding intersection of lines material covered inequalities feasible regions optimisation achievement with merit excellence apply methods using relational extended solving problems thinking abstract...

no reviews yet
Please Login to review.