jagomart
digital resources
picture1_031604keichle


 152x       Filetype PPT       File size 0.55 MB       Source: www.pointofcare.net


File: 031604keichle
outline compliance improvement with connectivity quality management program for unit use devices continuous glucose monitors pre analytical analytical and post analytical factors plastic capillary tubes operator lockout monitored for three ...

icon picture PPT Filetype Power Point PPT | Posted on 12 Sep 2022 | 3 years ago
Partial capture of text on file.
                            Outline
        Compliance improvement with connectivity
        Quality management program for unit use 
          devices
        Continuous glucose monitors: pre-
          analytical, analytical and post-analytical 
          factors
        Plastic capillary tubes
                                
                 Operator Lockout Monitored for Three Random 
                                     Units
              s10    8            8
              r 8
              e
            f s
            o U
                6                                5
            r d
            e e                     4
            b z                               3
              i 4
            m r                                    2
            u o
            N h            1
              t 2
              u         0              0                  0 0 0
              a
              n 0
              U
                       May         June         July      October*
                                        Month
                     5 North         6 East          9 North
        *Post RALS Plus implementation with the operator lockout 
        feature.
                                       
            Unauthorized operators on all 61 nursing 
            units before and after connectivity:  Costs
                                          Before          After 
                 Expenses              Connectivity    Connectivity
       POCT time spent on creating        36 hrs           0 hrs
       and issuing reports/3 mos
       Nursing time spent                 4.5 hrs          0 hrs
       responding to reports/3 mos
       TOTAL unauthorized                $847.80          $0.00
       operators associated labor 
       cost/3 mos
                                      
          Quality control failures: Costs
                                  Before          After
            POCT Cost          Connectivity   Connectivity
       Time spent 
       troubleshooting/ 3         3 hrs          15 min
       mos
       TOTAL 
       troubleshooting labor     $58.53           $4.88
       cost/3 mos
                                 
           Reduction in labor costs after interface of 
           the Inform with the LIS: 3 month period
                  Expenses                Before         After 
                                        Connectivity Connectivity
       Manual result LIS entry:
         Average time/single result        1 min           0
         Average number results/3 mos     84,858        84,858
         Labor cost                     $32,627.90       $0.00
       Performing manual audits:
         Time required/3 mos               24 hrs          0
         Labor cost                       $468.24        $0.00
       TOTAL labor costs related to 
       manual result entry and audits   $33,096.14       $0.00
                                    
The words contained in this file might help you see if this file matches what you are looking for:

...Outline compliance improvement with connectivity quality management program for unit use devices continuous glucose monitors pre analytical and post factors plastic capillary tubes operator lockout monitored three random units s r e f o u d b z i m n h t a may june july october month north east rals plus implementation the feature unauthorized operators on all nursing before after costs expenses poct time spent creating hrs issuing reports mos responding to total associated labor cost control failures troubleshooting min reduction in interface of inform lis period manual result entry average single number results performing audits required related...

no reviews yet
Please Login to review.