152x Filetype PPT File size 0.55 MB Source: www.pointofcare.net
Outline Compliance improvement with connectivity Quality management program for unit use devices Continuous glucose monitors: pre- analytical, analytical and post-analytical factors Plastic capillary tubes Operator Lockout Monitored for Three Random Units s10 8 8 r 8 e f s o U 6 5 r d e e 4 b z 3 i 4 m r 2 u o N h 1 t 2 u 0 0 0 0 0 a n 0 U May June July October* Month 5 North 6 East 9 North *Post RALS Plus implementation with the operator lockout feature. Unauthorized operators on all 61 nursing units before and after connectivity: Costs Before After Expenses Connectivity Connectivity POCT time spent on creating 36 hrs 0 hrs and issuing reports/3 mos Nursing time spent 4.5 hrs 0 hrs responding to reports/3 mos TOTAL unauthorized $847.80 $0.00 operators associated labor cost/3 mos Quality control failures: Costs Before After POCT Cost Connectivity Connectivity Time spent troubleshooting/ 3 3 hrs 15 min mos TOTAL troubleshooting labor $58.53 $4.88 cost/3 mos Reduction in labor costs after interface of the Inform with the LIS: 3 month period Expenses Before After Connectivity Connectivity Manual result LIS entry: Average time/single result 1 min 0 Average number results/3 mos 84,858 84,858 Labor cost $32,627.90 $0.00 Performing manual audits: Time required/3 mos 24 hrs 0 Labor cost $468.24 $0.00 TOTAL labor costs related to manual result entry and audits $33,096.14 $0.00
no reviews yet
Please Login to review.