222x Filetype XLS File size 0.05 MB Source: eop
Generic Tree of Ground Segment Documents PV, 7 Nov 2007 Documents Responsibility Date 1st agreed issue Comments Mission Requirements Document (MRD) Project Programme Proposal scientific requirements for the mission Satellite System Requirements Document (SRD) Project Phase B/C/D ITT satellite spec (+ attachments such as deliverable items and docs) Memorandum Of Understanding(s) with External Partner(s) (if any) Project SAT-PDR definition of relationship and respective duties of ESA and partner Data Policy Project Phase B/C/D ITT normally defined for a programme, may be amended per mission Context Project Master Schedule Project adhoc updated regularly, includes space and ground segments Ground Segment Functional and Operational Concept Project GS-RR functional breakdown, operations concept, high-level system requirements Ground Segment Implementation Plan Project GS-RR implementation overview, responsibilities, reviews, GS schedule Ground Segment Technical Budget Project GS-PDR performance figures for network links, run-time processing, storage, distribution… Mission Analysis Studies Document Project adhoc agreed results on orbit, instrument planning, downlinks, etc… (refs to detailed TNs) FOS Mission Implementation Requirements Document (MIRD) Project GS-RR tasks, deliverables, CFIs, high-level requirements FOS Mission Implementation Plan (MIP) Esoc GS-RR architecture, internal interfaces, ops concept, detailed schedule, manpower, dev plan Functional FOS Facilities SRDs Esoc GS-PDR specs of sub-systems, for information to Project Specs PDGS Mission Implementation Requirements Document (MIRD) Project GS-RR tasks, deliverables, CFIs, high-level requirements PDGS Mission Implementation Plan (MIP) Esrin GS-RR architecture, internal interfaces, teams, detailed schedule, manpower, dev plan PDGS Facilities SRDs Esrin GS-PDR specs of sub-systems, for information to Project Ground Segment Interfaces Overview Project GS-PDR systematic structured list of all interfaces, ICDs, format specs; used to conf control interfaces ICDs Space2Ground ICDs Sat Prime SAT-PDR RF and data interfaces, for command/control and science data Ground Segment ICDs Project/Esrin/Esoc GS-CDR interfaces between Satellite, FOS, PDGS and external systems (if any) Format Specifications Tailorisation of EO File Format Standards Project/Esrin GS-RR file naming conventions, etc… (closing the issues left open by the Standard) Packet Utilisation Standard (PUS) Sat Prime SAT-PDR TM/TC definition, VCID and APID allocation, services definition, etc... Interfaces TM/TC Format Specifications Sat Prime SAT-PDR detailed definition of packets and fields Specs Data Products Specifications Project/Esrin SAT-PDR (L0); GS-CDR (L1/L2) detailed definition of science data products Other File Format Specifications Project/Esrin GS-CDR detailed definition of other files (e.g. auxiliary data) Inputs to Operations Satellite TM/TC Database ICD Esoc SAT-PDR spec of SDB delivery format (typically SCOS2K format) OBSW Images ICD Esoc SAT-PDR spec of OBSW delivery format Satellite Flight Operations Manual (FOM) Sat Prime SAT-CDR detailed description of satellite operations, including flight dynamics constraints Instrument Operations Manual(S) (IOM(s)) Sat Prime SAT-CDR detailed description of instruments operations Flight Operations Procedures (FOP) Sat Prime SAT-CDR flight procedures, tested on satellite (typically in MOIS format) Satellite documents Satellite Assembly Integration and Validation (AIV) Plan/Test Specs Sat Prime SAT-PDR overall plan for satellie integration and validation Satellite AIV Procedures Sat Prime adhoc detailed testing procedures Satellite AIV Reports Sat Prime adhoc detailed test reports Satellite Requirements Traceability Matrix Sat Prime SAT-QR systematic verification of SRD requirements FOS documents FOS Validation Plan/Test Specs Esoc GS-CDR overall plan for FOS integration and validation FOS Acceptance Procedures Esoc adhoc detailed testing procedures (FOS overall and FOS facilities) FOS Acceptance Reports Esoc adhoc detailed test reports (FOS overall and FOS facilities) FOS Requirements Traceability Matrix Esoc GS-AR systematic verification of MIRD requirements PDGS documents PDGS Validation Plan/Test Specs Esrin GS-CDR overall plan for PDGS integration and validation Validation PDGS Acceptance Procedures Esrin adhoc detailed testing procedures (PDGS overall and FOS facilities) Validation PDGS Acceptance Reports Esrin adhoc detailed test reports (PDGS overall and FOS facilities) PDGS Requirements Traceability Matrix Esrin GS-AR systematic verification of MIRD requirements System documents Overall System Validation Plan Project GS-PDR systematic list of tests, clarifies SVT / GSOV / S2G tests coverage/responsabilities, test scenario, test data preparation responsibilities SVT Plan Project/Esoc SAT-CDR overall plan for SVTs (today called SVT Master Test Plan) SVT Test Plan/Procedures Project/Esoc adhoc detailed plans/procedures for each SVT SVT Test reports Project/Esoc adhoc detailed reports for each SVT GSV Plan Project GS-CDR was "GSOV": tests of all ground links: compatibility, integration, validation GSV Test Plan/Procedures Project adhoc detailed plans/procedures for each GSV test GSV Test Reports Project adhoc detailed reports for each GSV test Space2Ground (S2G) Plan Project SAT-CDR "everything else": RF tests, X-band compatibility tests, etc… S2G Test Plan/Procedures Project adhoc detailed plans/procedures for each S2G test S2G Test Reports Project adhoc detailed reports for each S2G test high-level plans Calibration Plan Project SAT-CDR plan of instruments and platform calibration activities, during phases E1 and E2 Validation Plan Project/Esrin GS-CDR plan of instruments and platform validation activities, during phases E1 and E2 OBSW Maintenance Plan Project/Sat Prime SAT-CDR definition of tasks and responsabilities for OBSW maintenance and validation training FOS Training Plans Esoc GS-CDR simulations, other training, mission readiness FOS Training Reports Esoc GS-AR detailed reports on training PDGS Training Plans Esrin GS-CDR facilities and system-level training PDGS Training Reports Esrin GS-AR detailed reports on training user manuals FOS Facilities User Manuals Esoc GS-AR detailed operating manuals for each facility PDGS Facilities User Manuals Esrin GS-AR detailed operating manuals for each facility Operations Plan for Phase E1 Project GS-CDR covers LEOP, IOV, CalVal at system level FOS documents FOS Operations Plan for LEOP Esoc GS-AR for LEOP, Esoc control of Operations FOS Facilities Operations Procedures for LEOP Esoc GS-AR detailed procedures Operations FOS Operations Plan for In-Orbit Verification (IOV) Esoc GS-AR for IOV, Project control of Operations FOS Facilities Operations Procedures for IOV Esoc GS-AR detailed procedures FOS Operations Plan for CalVal Esoc GS-AR for CalVal during phase E1, Project control of Operations FOS Facilities Operations Procedures for CalVal Esoc GS-AR detailed procedures PDGS documents PDGS Operations Plan for IOV Esrin GS-AR for IOV, Project control of Operations PDGS Facilities Operations Procedures for IOV Esrin GS-AR detailed procedures PDGS Operations Plan for CalVal Esrin GS-AR for CalVal during phase E1, Project control of Operations PDGS Facilities Operations Procedures for CalVal Esrin GS-AR detailed procedures Operations Plan for Phase E2 Esrin GS-CDR covers routine operations at system level FOS documents FOS Operations Plan for Phase E2 Esoc GS-AR for routine ops and CalVal during phase E2, Esrin control of Operations FOS Facilities Operations Procedures for Phase E2 Esoc GS-AR detailed procedures PDGS documents PDGS Operations Plan for Phase E2 Esrin GS-AR for routine ops and CalVal during phase E2, Esrin control of Operations PDGS Facilities Operations Procedures for Phase E2 Esrin GS-AR detailed procedures Plan for Transfer to Phase E2 Project/Esrin GS-AR transfer of responsibility between Project and Esrin
no reviews yet
Please Login to review.