200x Filetype XLSX File size 1.46 MB Source: www.nzta.govt.nz
2021-2024 CMR form v1.0 (created 30.09.21) Change Management Request FY 21.22 Annual Plan The 3 Year Plan Templates 21.24, with ranked activities, have been updated based on the allocations published in July 2021, and a detailed 21.22 Annual Plan provided. Regional allocations have been released, as well as Centrally Held funds where requests for release have been received/processed. From the detailed Annual Plan the following achievement trackers have been established for September Baseline: - Pavement and surfacing - SCRIM - ATP - Drainage renewals - Structures Changes to the programmes; including scope, site, length or value require a Change Management Request (CMR). o Any CMR received after 15th December will require Mitigating Circumstances approved by CMT and/or Board st o No further changes to the Tracker will be accepted from 1 March. Where change is within financial delegations (DFA) and within the regions budget allocation the following applies: Contract variations will need to be managed within the allocations available. Where this is unable to be achieved, a Priority Funding Request can be made to the Principal Advisor - Maintenance Programmes for capture in priority matrix. If funding becomes available these applications will be considered for funding release. CMR Application Process 1. Supplier/Network Manager (NM) prepare CMR a) All submissions require the Change Form tab be completed b) Changes to renewals programmes (i.e. tracker records) require the Changes to Programme tab be completed c) Complete all fields if possible d) Drop down fields are available for use and protected to prevent overwriting > Network, Project Name, Project Number > Work Category (this will assist identifying approvers) > Nature of Change (this aligns with the Achievement tracker selections) > Risk/Opportunity > ALL Grey cells are to be completed on Changes to Programme tab 2021-2024 CMR form v1.0 (created 30.09.21) 2. As per above, the System Manager (SM), Asset Investment Advisor (AIA), Project Manager - Structures, and/or Regional Manager may be required to approve depending on the Activity. 3. Approved forms are required to be uploaded to the Network 'Change Requests' folder, and 3a. infoHub link emailed to rapas@nzta.govt.nz 4. Programme & Standards team will, within 5 working days of receipt: a) adjust allocations in SAP, b) update achievement tracker (please note - the tracker is refreshed twice a month, not daily), and c) send confirmation of action to NM as appropriate. Links https://www.nzta.govt.nz/roads-and-rail/highways-information-portal/processes/strategic-activity-management/annual-planning/ https://www.nzta.govt.nz/assets/Highways-Information-Portal/Processes/Strategic-activity-management/Annual-planning/Annual-planning-docs/Achievement-tracker-process-guidelines-september-2021.pdf Change Management Record - 21/22 Annual Plan Year Change No Project Type (1) Select Project Name (2) Select Project number (3) 21/22 yyyymm_001 Documenting the changes made from a baseline which is the current version of the annual plan on the server So, the changes include any changes made as a result of the initial moderation feedback and changes made by the initial moderation work Telling us what has been changed and why By how much Residual Risk and Management Plan Sign off as per the delegations in change management process Work The consequences of the changes on Annual Plan, Programme and/or WBS Category Nature of change What have you changed and why including link to revised programmes Funding change +/- ($k) Risk/Opportunity Waka Kotahi, and how these have been considered/managed SUBMITTED by Approved (Y/N) WC212 CS WC215 Total Requested $0.0 Total Approved $0.0 Senior Network Managers Endorsment Name Date Senior Network Managers Recomendations: Approvals (see change management process for for futher details) DO NOT TYPE OVER GREEN CELLS Comments Asset Investment Advisor Date Required Principal Structural Engineer/SMC Date Required System Manager Date Not Required Endorsed by Date APMT Approval Comments: Updates Comments Achievement tracker Date Allocations Date Comments: 18/19 Version V1.0 Issued 10 August, 2018 change_management_record_annual_plan_2021_22.xlsx DO NOT TYPE OVER THESE CELLS ALL GREY CELLS AT TO BE COMPLETED Select Network first then State Highway to populate the RoadName lookup Line item no# Tracker ID State Highway Road Name Start End Length 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0
no reviews yet
Please Login to review.