Revision 18. Date February 18, 2022. This is a version controlled document. Printed copies are not controlled Cost Estimate Submission Checklist Project ID: Project Name: Checklist Item Reference Included For DDC Use (Y/N) Estimating Workshop Minutes of Meeting 1 Construction Work Cost Summary Worksheet Detailed Worksheets Hard Cost Detail Worksheet (Level 1) Hard Cost Detail Worksheet (Level 2) Hard Cost Itemized General Requirements Worksheet Bid Contingency Worksheet Construction Contract Allowance Worksheet Basis of Estimate Report Project Complexity Report Project Type Report 1. Minutes of Meeting shall include all decisions made relevant to basis of estimate Note: Shaded cell is where data must be entered 08/14/2022 Section 3.2. SubmissionChecklist 272 Project ID: Construction Work Cost Summary Line Item Description Calculation Cost A Hard Cost Summary see Detail Sheet $ - B General Conditions Included in Hard Cost, General Requirements (Division 1) C Design Contingency see Basis of Estimate D Overhead and Profit see Basis of Estimate E Cost Escalation see Basis of Estimate F Subtotal Sum (A thru E) $ - G Bid Contingency see Detail Sheet $ - H Construction Contract Allowance see Detail Sheet $ - I Estimated Construction Cost at Award F+G+H $ - J Construction Contingency see Basis of Estimate K Estimated Construction Cost at Completion I+J $ - SIGN OFF: PROJECT MANAGER: SIGNATURE: DATE: UNIT PROGRAM DIRECTOR: SIGNATURE: DATE: 08/14/2022 Section 3.2. CostSummary 272 Project ID: Hard Cost Estimate (Level 1) Trade Cost % General Construction (Including General Condition) $ - Plumbing $ - DDC - Bid Disposition Use Only Mechanical $ - Electrical $ - Subtotal $ - Total cost CSI Division: Total Cost Material: Labor: Equipment: DIVISION 01 - GENERAL REQUIREMENTS DIVISION 02 - EXISTING CONDITIONS $ - $ - $ - $ - DIVISION 03 - CONCRETE $ - $ - $ - $ - DIVISION 04 - MASONRY $ - $ - $ - $ - DIVISION 05 - METALS $ - $ - $ - $ - DIVISION 06 - WOOD, PLASTICS, COMPOSITES $ - $ - $ - $ - DIVISION 07 - THERMAL AND MOISTURE PROTECTION $ - $ - $ - $ - DIVISION 08 - OPENINGS $ - $ - $ - $ - DIVISION 09 - FINISHES $ - $ - $ - $ - DIVISION 10 - SPECIALTIES $ - $ - $ - $ - DIVISION 11 - EQUIPMENT $ - $ - $ - $ - DIVISION 12 - FURNISHINGS $ - $ - $ - $ - DIVISION 13 - SPECIAL CONSTRUCTION $ - $ - $ - $ - DIVISION 14 - CONVEYING EQUIPMENT $ - $ - $ - $ - DIVISION 21 - FIRE SUPPRESSION $ - $ - $ - $ - DIVISION 22 - PLUMBING $ - $ - $ - $ - DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) $ - $ - $ - $ - DIVISION 25 - INTEGRATED AUTOMATION $ - $ - $ - $ - DIVISION 26 - ELECTRICAL $ - $ - $ - $ - DIVISION 27 - COMMUNICATIONS $ - $ - $ - $ - DIVISION 28 - ELECTRONIC SAFETY AND SECURITY $ - $ - $ - $ - DIVISION 31 - EARTHWORK $ - $ - $ - $ - DIVISION 32 - EXTERIOR IMPROVEMENTS $ - $ - $ - $ - DIVISION 33 - UTILITIES $ - $ - $ - $ - DIVISION 34 - TRANSPORTATION $ - $ - $ - $ - DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION $ - $ - $ - $ - DIVISION 40 - PROCESS INTEGRATION $ - $ - $ - $ - DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT $ - $ - $ - $ - DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT $ - $ - $ - $ - DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT $ - $ - $ - $ - DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT $ - $ - $ - $ - DIVISION 45 - INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT $ - $ - $ - $ - DIVISION 46 - WATER AND WASTEWATER EQUIPMENT $ - $ - $ - $ - DIVISION 48 - ELECTRICAL POWER GENERATION $ - $ - $ - $ - Hard Cost: $ - $ - $ - $ - Hard Cost Summary(Including General Requirement): $ - 08/14/2022 Section 3.2. HardCostDetailLevel1 272 Project ID: Hard Cost Estimate (Level 2) Sub Work CSI Sub RSMeans Vendor Quote Material $: Labor $: Equipment $: Total $: No. (*) CSI Division: Division: 12-digit item (Yes/ No): Description: Qty Unit: DDC COMMENTS: code: U/Cost: T/Cost: U/Time: T/Time: Wage: U/Cost: T/Cost: U/Cost: T/Cost: U/Cost: T/Cost: DIVISION 01 - GENERAL REQUIREMENTS Total from HardCostGeneralRequirements $ - DIVISION 01 - GENERAL REQUIREMENTS SUB TOTAL DIVISION 02 - EXISTING CONDITIONS copy above cell and insert copied cell above the row DIVISION 02 - EXISTING CONDITIONS SUB TOTAL DIVISION 03 - CONCRETE copy above cell and insert copied cell above the row DIVISION 03 - CONCRETE SUB TOTAL DIVISION 04 - MASONRY copy above cell and insert copied cell above the row DIVISION 04 - MASONRY SUB TOTAL DIVISION 05 - METALS copy above cell and insert copied cell above the row DIVISION 05 - METALS SUB TOTAL DIVISION 06 - WOOD, PLASTICS, COMPOSITES copy above cell and insert copied cell above the row DIVISION 06 - WOOD, PLASTICS, COMPOSITES SUB TOTAL DIVISION 07 - THERMAL AND MOISTURE PROTECTION copy above cell and insert copied cell above the row DIVISION 07 - THERMAL AND MOISTURE PROTECTION SUB TOTAL DIVISION 08 - OPENINGS copy above cell and insert copied cell above the row DIVISION 08 - OPENINGS SUB TOTAL DIVISION 09 - FINISHES copy above cell and insert copied cell above the row DIVISION 09 - FINISHES SUB TOTAL DIVISION 10 - SPECIALTIES copy above cell and insert copied cell above the row DIVISION 10 - SPECIALTIES SUB TOTAL 08/14/2022 Page 4 of 272 Section 3.2. HardCostDetailLevel2
no reviews yet
Please Login to review.