estimate of construction cost under the developer agreement with loudoun water each project must be built under a performance bond to assurance completion of the public improvements a payment bond ...

icon picture XLSX Filetype Excel XLSX | Posted on 14 Aug 2022 | 3 years ago
Partial file snippet.
        Estimate of Construction 
        Cost
          Under the Developer Agreement  with Loudoun Water , each project must be built under a 
          performance bond to assurance completion of the public improvements, a payment bond to ensure 
          that contractors and suppliers are paid, and a maintenance bond to serve as a warranty on the 
          work.  This form may be used to establish the amount of the performance and payment bonds.  
          Listed below are unit costs for many of the items that are installed on a typical project.  Where the 
          scope of work is not reflected, or not fully reflected by the listed items and prices, the developer or 
          engineer will furnish an estimate of cost using other sources, such as a formal engineer’s estimate 
          or a contract for the work. 
          The listed items may be considered to include the labor, materials, and equipment needed to make a 
          complete, typical installation.  Components included are clearing; siltation and erosion control; 
          excavation and trench de-watering; pipe and fittings; blocking and thrust restraint; bedding; native 
          backfill; acceptance testing; and restoration.   Add estimate for items that are site specific, to 
          include, among others: blasting in open trench, rock excavation by hoe-ram, imported backfill, 
          offsite dispoal, installation of sewer to a depth greater than 20 feet, and landscape replacement.
        Project Name:
        Project ID #:                                               Date Prepared:
        Item                                                        Quantity    Unit    Unit Price       Total Price
                                                           WATER MAIN
         4" ductle iron pipe and fittings                                         LF    $           55   $                           -   
         6" ductile iron pipe and fittings                                        LF    $           70   $                           -   
         8" ductile iron pipe and fittings                                        LF    $           85   $                           -   
        10" ductile iron pipe and fittings                                        LF    $         100   $                           -   
        12" ductile iron pipe and fittings                                        LF    $         110   $                           -   
        16" ductile iron pipe and fittings                                        LF    $         140   $                           -   
        20" ductile iron pipe and fittings                                        LF    $         160   $                           -   
        24" ductile iron pipe and fittings                                        LF    $         220   $                           -   
        30" ductile iron pipe and fittings                                        LF    $         280   $                           -   
                                                               VALVE
        4" or  6" valve                                                         Each  $      1,000   $                           -   
        8", 10" or 12" valve                                                    Each  $      2,500   $                           -   
        16" or 20" valve                                                        Each  $      5,000   $                           -   
        24" or 30" valve                                                        Each  $      9,000   $                           -   
                                                          FIRE HYDRANT
        hydrant assembly including auxilary valve                               Each  $      5,300   $                           -   
                                                           AIR RELEASE
        air release assembly with manhole                                       Each  $      6,000   $                           -   
                                             EXTENSION FROM EXISTING BLOW-OFF
        4" thru 12" main                                                        Each  $      2,000   $                           -   
        16" thru 30" main                                                       Each  $      3,500   $                           -   
                                                    CUT-IN ON EXISTING MAIN
        6" thru 12" existing main - not including valve(s)                      Each  $      5,000   $                           -   
        16" thru 30" existing main - not including valve(s)                     Each  $    10,000   $                           -   
                                                   WET TAP OF EXISTING MAIN
        6" thru 12" existing main including tapping sleeve and valv             Each  $      8,400   $                           -   
        16" thru 24" existing main including tapping sleeve and val             Each  $    15,750   $                           -   
        Engineering Design Manual, Appendix A                                                                 Page 1 of 3
        Estimate of Construction Cost
        April 2021
        Item                                                        Quantity    Unit    Unit Price       Total Price
                                                      SERVICE CONNECTION
        1" service with meter setting                                           Each  $      1,800   $                           -   
        1.5" and 2" service with meter setting                                  Each  $      3,600   $                           -   
        3" or larger service with underground meter, including 6" v             Each  $    22,000   $                           -   
        fire or domestic connection with indoor meter, including 6"             Each  $      2,000   $                           -   
                                                     TEMPORARY BLOW-OFF
        temporary blow-off with line anchor on 4" thru 12" main                 Each  $      2,500   $                           -   
        temporary blow-off with line anchor on 16" thru 30" main                Each  $      4,000   $                           -   
                                                     TRENCHLESS CROSSING
        bore pit and retrieval pit                                              Each  $      7,500   $                           -   
        jack and bore with 16" or 20" casing                                      LF    $      1,000   $                           -   
        jack and bore with 24" or 30" casing                                      LF    $      1,500   $                           -   
        jack and bore with 36" or 42" casing                                      LF    $      2,200   $                           -   
        jack and bore or tunnel with 48" thru 60" casing or liner                 LF    $      3,000   $                           -   
                                                     WATER MISCELLANEOUS
        polyethylene encasement, bonded joints and anode beds                     LF    $           25   $                           -   
        anode bed and test station                                              Each  $      4,000   $                           -   
                                                                                                     $                           -   
                                                                                                     $                           -   
                                                                                                     $                           -   
                                                                                                     $                           -   
        WATER SUBTOTAL:                                                                              $                        -   
         
        Item                                                        Quantity    Unit    Unit Price       Total Price
                                                       8" SANITARY SEWER
        depths to 10' of cover                                                    LF    $           68   $                           -   
        cover more than 10'                                                       LF    $         131   $                           -   
                                                      10" SANITARY SEWER
        depths to 10' of cover                                                    LF    $           80   $                           -   
        cover more than 10'                                                       LF    $         142   $                           -   
                                                      12" SANITARY SEWER
        depths to 10' of cover                                                    LF    $           90   $                           -   
        cover more than 10'                                                       LF    $         152   $                           -   
                                                      16" SANITARY SEWER
        depths to 10' of cover                                                    LF    $         110   $                           -   
        cover more than 10'                                                       LF    $         185   $                           -   
                                                      20" SANITARY SEWER
        depths to 10' of cover                                                    LF    $         125   $                           -   
        cover more than 10'                                                       LF    $         200   $                           -   
                                                      24" SANITARY SEWER
        depths to 10' of cover                                                    LF    $         140   $                           -   
        cover more than 10'                                                       LF    $         210   $                           -   
                                                      30" SANITARY SEWER
        depths to 10' of cover                                                    LF    $         165   $                           -   
        cover more than 10'                                                       LF    $         265   $                           -   
        Engineering Design Manual, Appendix A                                                                 Page 2 of 3
        Estimate of Construction Cost
        April 2021
        Item                                                          Quantity    Unit    Unit Price        Total Price
                                                        36" SANITARY SEWER
        depths to 10' of cover                                                      LF    $         200   $                           -   
        cover more than 10'                                                         LF    $         285   $                           -   
                                                             MANHOLE
        4' inside diameter, 6' depth                                              Each  $      5,250   $                           -   
        4' inside diameter, depth below 6'                                         VF     $         368   $                           -   
        5' inside diameter, 6' depth                                              Each  $      6,825   $                           -   
        5' inside diameter, depth below 6'                                         VF     $         525   $                           -   
        connect to existing manhole by core and boot                              Each  $      2,500   $                           -   
                                                      TRENCHLESS CROSSING
        bore pit and retrieval pit                                                Each  $      7,500   $                           -   
        jack and bore through 24" or smaller casing                                 LF    $      1,000   $                           -   
        jack and bore with 30" thru 42" casing                                      LF    $      2,200   $                           -   
        jack and bore or tunnel with 48" thru 60" casing or liner                   LF    $      3,000   $                           -   
                                                      SEWER MISCELLANEOUS
        sewer service connection and lateral                                      Each  $      2,000   $                           -   
        concrete encasement                                                         LF    $         200   $                           -   
        bypass pumping-one segment for one week                                   Each  $      5,000   $                           -   
                                                                                                        $                           -   
                                                                                                        $                           -   
                                                                                                        $                           -   
                                                                                                        $                           -   
        SEWER SUBTOTAL:                                                                                $                        -   
                                              MISCELLANEOUS FOR WATER OR SEWER
        16" or 20" casing installed by direct bury                                  LF    $         160   $                           -   
        24" or 30" casing installed by direct bury                                  LF    $         200   $                           -   
        36" or 42" casing installed by direct bury                                  LF    $         290   $                           -   
        pavement restoration, 4" deep patch                                        SY     $           75   $                           -   
        mill pavement and overlay                                                  SY     $           30   $                           -   
        traffic control                                                            Day    $      2,200   $                           -   
        imported backfill                                                          CY     $           30   $                           -   
        rock excavation by hoe-ram                                                 CY     $         300   $                           -   
        12' gravel access road for dedication                                       LF    $           18   $                           -   
                                                                                                        $                           -   
                                                                                                        $                           -   
        MISCELLANEOUS SUBTOTAL:                                                                        $                        -   
        Water Subtotal + Sewer Subtotal + Miscellaneous Subtotal  $                                                                               - 
        Mobilization                                                   $                                                                               - 
        10% Construction Contingency                                   $                                                                               - 
        Inflation During the Project at 4% fo 3   years                $                                                                               - 
        ESTIMATED COST OF CONSTRUCTION:                                $                                                                 - 
        Engineering Design Manual, Appendix A                                                                    Page 3 of 3
        Estimate of Construction Cost
        April 2021
The words contained in this file might help you see if this file matches what you are looking for:

...Estimate of construction cost under the developer agreement with loudoun water each project must be built a performance bond to assurance completion public improvements payment ensure that contractors and suppliers are paid maintenance serve as warranty on work this form may used establish amount bonds listed below unit costs for many items installed typical where scope is not reflected or fully by prices engineer will furnish an using other sources such formal s contract considered include labor materials equipment needed make complete installation components included clearing siltation erosion control excavation trench dewatering pipe fittings blocking thrust restraint bedding native backfill acceptance testing restoration add site specific among others blasting in open rock hoeram imported offsite dispoal sewer depth greater than feet landscape replacement name id date prepared item quantity price total main ductle iron lf ductile valve fire hydrant assembly including auxilary air r...

no reviews yet
Please Login to review.