sheet 1 csp project checklist form statusinformation date entered by y 2 preconstruction phase 3 project name 4 project numberuser ref see 209 5 project famis acct number 6 commodity ...

icon picture XLS Filetype Excel XLS | Posted on 08 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: CSP Project Checklist




Form Status/Information Date Entered By:








Y 2 Pre-Construction Phase




3
Project Name:




4
Project Number/User Ref:, see 209




5
Project FAMIS Acct Number:




6
Commodity Code:




7
Project Total Budget:




7A
Less: 10 % Contingency Minimum




7B
Asbestos Abatement & Testing




7C
Compaction Testing




7D
Concrete Testing



Y 7E
Key Cores




7F
Moisture Testing



Y 7G
Newspaper




7H
Soil Core Testing




7I
Utility Easements




7J
Test and Balances




7K
TDLR Fee




7L
Windstorm Certification




8
Amt Available for A/E & Const Contract




9
Project Manager:




10
Project Manager Phone:




11
Project Manager Email:




12
Program of Requirement, see 210




13
A/E Needed?, >$8,000




14
A/E Selection




15
A/E Contact Information




16
A/E Contract Amount




17
A/E Requisition Doc C-32



18
A/E Contract Number




19
C-30 Reviewed with A/E




20
Contract Type: (CSP, JOC, DB, CMR,) see 211



Y 21
Contract Documents




22
Bid Package




23
Project Specifications (Div. 1-16)




24
Uniform General Conditions, see 212 C-8



25
Supplemental General Conditions, see 213 C-9



26
Special Conditions, see 214



Y 27
Considerations




28
Subcontracting Opportunities?




29
HSP Required? >$100,000




30
Bid Bond Required? >$25,000 C-2



31
Payment Bond Required? >$25,000 C-7



32
Performance Bond Required? >$100,000 C-6



33

Form Status/Information Date Entered By:
Y 34
Competitive Bid Check List



Y 35
Bid Opening Date/Time




36
Invitation for Bid C-3


Y 37
Pre Bid Conference Date & Room:




38
Pre Bid Conference Site:




39
FAMIS R Doc Number




40
R Doc Submitted to Routing (Date)




41
Bids Required:




42
Bid Number:




43
ESBD Posting Required? >$25,000




44
ESBD Posting Date:




45
Newspaper R Doc 1




46
Newspaper R Doc 2




47
Ad Dates




48
Bid Addendum 1 Posted




49
Bid Addendum 2 Posted




50
Bid Addendum 3 Posted




51
Bids Opened On:




52
Bid Opening Presiding Officer (SSGS)



Y 53
HSP Reviewed & Approved By:



Y 54
C-10 Routing and Approvals



Y 55
C-10 Recommended by PM C-10


Y 56
C-10 Certified by SSGS C-10



57
Contract No. Assigned by SSGS (Date) C-10



58
Contract Number: C-10


Y 59
C-10 Signed by VPFA (Date) C-10



60
Contract Awarded:




61
Ground Breaking Ceremony?




62






63






64

Form Status/Information Date Entered By:
Y 65
Contractor Information




66
Contractor:




67
Contractor Rep:




68
Contractor Rep Phone:




69
Contractor Rep Email:




70






71
Notification Letter Sent to Contractor, see 215




72
Contract Sent to Contractor, see 216




73
Insurance Received (Date)




74
Payment Bond Received (Date)




75
Performance Bond Received (Date)




76
Contract Signed by Contractor (Date)




77
Contract Signed by PM (Date)




78
Contract Signed by SSGS (Date)




79
Contract Signed by VPFA (Date)




80
Contracts Distributed (Date), see 217




81
Spreadsheet Posted on Server, Procurement (Date)




82
Pre Construction Meeting Notice Mailed (Date)




83
Pre Construction Meeting (Date):




84
C-30 Reviewed with Contractor




85
Dig Permit?




86
Notice to Proceed to Contractor (Date)




87
Construction Schedule Received




88
Schedule of Values Received




89
Notify Property Manager of Utility changes




90
Record all meter readings for utility useage, if applicable




91






92






93

Form Status/Information Date Entered By:
Y 94 Construction Phase Documents




95
Asbestos Abatement - Results




96
Compaction Testing - Results




97
Concrete Testing - Results



Y 98
Key Core Plan




99
Moisture Testing - Results




100
Soil Core Testing - Results




101
Utility Easements - Results




102
Test and Balances - Results




103
TDLR Inspection




104
Windstorm Certificate




105
Inspection Report



Y 106
Reoccuring Documents




107
Payment No. 1 (Amount/Date)




108
Change Order No 1. Amount/Date C-21/11



109
Substantial Completion



Y 110 Pre-Project Close-Out
Complete/Received? Yes/No/NA Date Entered By:

111
Payment Received for Contractor Utility Use




112
Beneficial Occupancy (Date), see 218




113
Equipment startup/proofing




114
Operator training




115
O&M Manuals




116
As built Drawing Received (Date)




117
Shop Drawings and Submittals




118
Letter of Warranty Received (Date)




119
Product Warranties received




120
Spare Parts and Materials




121
Keys (Contractors/Users)




122
Contractor Site Clean-up




123
NFPA Inspection, see 219




124
TDLR-ADA Insp. >$50,000.00, see 220




125
TDSHS insp. >$50,000.00, see 221




126
Telecom; (Cable, TTVN)




127
Project Manager Inspection




128
Final punchlist established




129
Final Inspection Date Established




130
Report of substantial Completion C13a



131
Ribbon Cutting Ceremony?




132





Y 133 STAFF REVIEW
Accepted? Yes/No/NA


134
(E-mail notice, 24hr response time)




135
Director of CIS




136
Director of Physical Plant




137
Director of Risk Management




138
Director of Engineering & Planning




139
Director of University Police




140
Executive Director of Facilities



Y 141 Final Project Close-Out
Completed? Yes/No/NA Date Entered By:

142
All punchlist items completed




143
Final Payments to Sub-Contractors




144
Release of Liens




145
Engineer/Architect letter of acceptance




146
Report of Final Acceptance C-13b



147
CIP Closeout Report Filed (Date)




148





Y 149 Contract Close-Out
Completed? Yes/No/NA


150
Construction costs distributed by FAMIS Code C-30



151
attach



152
Verify project total amounts match pay requests




153





154
Verify all accounts included




155
Copy of FAMIS breakouts to Property Management




156





157
Final Change Order and Adjustments




158
Final Payment Authorization C-19



159 Terms:




160






161
A/E - Architect or Engineer
JOC - Job Order Contract

162
ADA - Americans with Disabilities Act
O&M - Operation and Maintenance

163
CIS - Computer Information System
P Doc - Purchase Order

164
CMR - Construction Manager at Risk
PM - Project Manager

165
CSP - Competitive Sealed Proposal
POR - Program of Requirements

166
DB - Design Build
R Doc - Requisition Order

167
ESBD - Electronic State Business Daily
SSGS - Strategic Sourcing and General Services

168
FAMIS - Financial Accounting Management Information System
TDH - Texas Department of Health

169
HSP - HUB Sub Plan
TDLR - Texas Department of Licensing and Regulation

170
HUB - Historically Underutilized Business
VPFA - Vice President for Finance and Administration

171






172






173 Footnotes:




174






175
Project Number must be inserted as User Ref: on all Requistions




176
Scope of Design and Work; Budget; and Schedule




177
Job Order Contract and Design Build have additional items for review on the next tab




178
Uniform document for state projects >$25,000




179
Document stating any changes in policy to the Uniform General Conditions




180
Documents specific to a project




181
Notification Letter must requests insurance, bonds, and pre-construction date. Signed C-10 and 3-copies of contract attached




182
3- Copies Attached with Notification Letter




183
Copies to Contractor, Procurement, and Project Manager




184
Before final completion, owner may occupy




185
National Fire Prevention Association Inspection




186
Texas Department of Licensing and Regulation (Boilers, Elevators, etc…)




187
Texas Department of State Health Services




188
Add additional rows if there are multiple Inspections Reports or list a directory where they can be found.




189
Add additional rows if there are multiple Payment Applications or list a directory where they can be found.




190
Add additional rows if there are multiple Change Orders or list a directory where they can be found.




191
TDLR inspection to be done before Final Project Closeout.











Y
CIS Considerations
Completed? Yes/No/NA Date Entered By:



Locate underground cable (fiber, telephone, etc.,)






Cable route from building to network infrastructure






Cable requirements (CAT6, fiber, telephone)






Card reader requirements






Video surveilance requirements






Multimedia rooms (audio, visual)






Computer labs






TTVN Room






Network equipment (wired, wireless)






Emergency notification system






Kiosk






Telecom requirements (MDF, IDF)




The words contained in this file might help you see if this file matches what you are looking for:

...Sheet csp project checklist form statusinformation date entered by y preconstruction phase name numberuser ref see famis acct number commodity code total budget a less contingency minimum b asbestos abatement amp testing c compaction d concrete e key cores f moisture g newspaper h soil core i utility easements j test and balances k tdlr fee l windstorm certification amt available for ae const contract manager phone email program of requirement needed gt selection contact information amount requisition doc reviewed with type joc db cmr documents bid package specifications div uniform general conditions supplemental special considerations subcontracting opportunities hsp required bond payment performance competitive check list opening datetime invitation pre conference room site r submitted to routing bids esbd posting ad dates addendum posted opened on presiding officer ssgs approved approvals recommended pm certified no assigned signed vpfa awarded ground breaking ceremony contractor r...