Sheet 1: CSP Project Checklist
Form | Status/Information | Date | Entered By: | ||||
Y | 2 | Pre-Construction Phase | |||||
3 | Project Name: | ||||||
4 | Project Number/User Ref:, see 209 | ||||||
5 | Project FAMIS Acct Number: | ||||||
6 | Commodity Code: | ||||||
7 | Project Total Budget: | ||||||
7A | Less: 10 % Contingency Minimum | ||||||
7B | Asbestos Abatement & Testing | ||||||
7C | Compaction Testing | ||||||
7D | Concrete Testing | ||||||
Y | 7E | Key Cores | |||||
7F | Moisture Testing | ||||||
Y | 7G | Newspaper | |||||
7H | Soil Core Testing | ||||||
7I | Utility Easements | ||||||
7J | Test and Balances | ||||||
7K | TDLR Fee | ||||||
7L | Windstorm Certification | ||||||
8 | Amt Available for A/E & Const Contract | ||||||
9 | Project Manager: | ||||||
10 | Project Manager Phone: | ||||||
11 | Project Manager Email: | ||||||
12 | Program of Requirement, see 210 | ||||||
13 | A/E Needed?, >$8,000 | ||||||
14 | A/E Selection | ||||||
15 | A/E Contact Information | ||||||
16 | A/E Contract Amount | ||||||
17 | A/E Requisition Doc | C-32 | |||||
18 | A/E Contract Number | ||||||
19 | C-30 Reviewed with A/E | ||||||
20 | Contract Type: (CSP, JOC, DB, CMR,) see 211 | ||||||
Y | 21 | Contract Documents | |||||
22 | Bid Package | ||||||
23 | Project Specifications (Div. 1-16) | ||||||
24 | Uniform General Conditions, see 212 | C-8 | |||||
25 | Supplemental General Conditions, see 213 | C-9 | |||||
26 | Special Conditions, see 214 | ||||||
Y | 27 | Considerations | |||||
28 | Subcontracting Opportunities? | ||||||
29 | HSP Required? >$100,000 | ||||||
30 | Bid Bond Required? >$25,000 | C-2 | |||||
31 | Payment Bond Required? >$25,000 | C-7 | |||||
32 | Performance Bond Required? >$100,000 | C-6 | |||||
33 | Form | Status/Information | Date | Entered By: | |||
Y | 34 | Competitive Bid Check List | |||||
Y | 35 | Bid Opening Date/Time | |||||
36 | Invitation for Bid | C-3 | |||||
Y | 37 | Pre Bid Conference Date & Room: | |||||
38 | Pre Bid Conference Site: | ||||||
39 | FAMIS R Doc Number | ||||||
40 | R Doc Submitted to Routing (Date) | ||||||
41 | Bids Required: | ||||||
42 | Bid Number: | ||||||
43 | ESBD Posting Required? >$25,000 | ||||||
44 | ESBD Posting Date: | ||||||
45 | Newspaper R Doc 1 | ||||||
46 | Newspaper R Doc 2 | ||||||
47 | Ad Dates | ||||||
48 | Bid Addendum 1 Posted | ||||||
49 | Bid Addendum 2 Posted | ||||||
50 | Bid Addendum 3 Posted | ||||||
51 | Bids Opened On: | ||||||
52 | Bid Opening Presiding Officer (SSGS) | ||||||
Y | 53 | HSP Reviewed & Approved By: | |||||
Y | 54 | C-10 Routing and Approvals | |||||
Y | 55 | C-10 Recommended by PM | C-10 | ||||
Y | 56 | C-10 Certified by SSGS | C-10 | ||||
57 | Contract No. Assigned by SSGS (Date) | C-10 | |||||
58 | Contract Number: | C-10 | |||||
Y | 59 | C-10 Signed by VPFA (Date) | C-10 | ||||
60 | Contract Awarded: | ||||||
61 | Ground Breaking Ceremony? | ||||||
62 | |||||||
63 | |||||||
64 | Form | Status/Information | Date | Entered By: | |||
Y | 65 | Contractor Information | |||||
66 | Contractor: | ||||||
67 | Contractor Rep: | ||||||
68 | Contractor Rep Phone: | ||||||
69 | Contractor Rep Email: | ||||||
70 | |||||||
71 | Notification Letter Sent to Contractor, see 215 | ||||||
72 | Contract Sent to Contractor, see 216 | ||||||
73 | Insurance Received (Date) | ||||||
74 | Payment Bond Received (Date) | ||||||
75 | Performance Bond Received (Date) | ||||||
76 | Contract Signed by Contractor (Date) | ||||||
77 | Contract Signed by PM (Date) | ||||||
78 | Contract Signed by SSGS (Date) | ||||||
79 | Contract Signed by VPFA (Date) | ||||||
80 | Contracts Distributed (Date), see 217 | ||||||
81 | Spreadsheet Posted on Server, Procurement (Date) | ||||||
82 | Pre Construction Meeting Notice Mailed (Date) | ||||||
83 | Pre Construction Meeting (Date): | ||||||
84 | C-30 Reviewed with Contractor | ||||||
85 | Dig Permit? | ||||||
86 | Notice to Proceed to Contractor (Date) | ||||||
87 | Construction Schedule Received | ||||||
88 | Schedule of Values Received | ||||||
89 | Notify Property Manager of Utility changes | ||||||
90 | Record all meter readings for utility useage, if applicable | ||||||
91 | |||||||
92 | |||||||
93 | Form | Status/Information | Date | Entered By: | |||
Y | 94 | Construction Phase Documents | |||||
95 | Asbestos Abatement - Results | ||||||
96 | Compaction Testing - Results | ||||||
97 | Concrete Testing - Results | ||||||
Y | 98 | Key Core Plan | |||||
99 | Moisture Testing - Results | ||||||
100 | Soil Core Testing - Results | ||||||
101 | Utility Easements - Results | ||||||
102 | Test and Balances - Results | ||||||
103 | TDLR Inspection | ||||||
104 | Windstorm Certificate | ||||||
105 | Inspection Report | ||||||
Y | 106 | Reoccuring Documents | |||||
107 | Payment No. 1 (Amount/Date) | ||||||
108 | Change Order No 1. Amount/Date | C-21/11 | |||||
109 | Substantial Completion | ||||||
Y | 110 | Pre-Project Close-Out | Complete/Received? Yes/No/NA | Date | Entered By: | ||
111 | Payment Received for Contractor Utility Use | ||||||
112 | Beneficial Occupancy (Date), see 218 | ||||||
113 | Equipment startup/proofing | ||||||
114 | Operator training | ||||||
115 | O&M Manuals | ||||||
116 | As built Drawing Received (Date) | ||||||
117 | Shop Drawings and Submittals | ||||||
118 | Letter of Warranty Received (Date) | ||||||
119 | Product Warranties received | ||||||
120 | Spare Parts and Materials | ||||||
121 | Keys (Contractors/Users) | ||||||
122 | Contractor Site Clean-up | ||||||
123 | NFPA Inspection, see 219 | ||||||
124 | TDLR-ADA Insp. >$50,000.00, see 220 | ||||||
125 | TDSHS insp. >$50,000.00, see 221 | ||||||
126 | Telecom; (Cable, TTVN) | ||||||
127 | Project Manager Inspection | ||||||
128 | Final punchlist established | ||||||
129 | Final Inspection Date Established | ||||||
130 | Report of substantial Completion | C13a | |||||
131 | Ribbon Cutting Ceremony? | ||||||
132 | |||||||
Y | 133 | STAFF REVIEW | Accepted? Yes/No/NA | ||||
134 | (E-mail notice, 24hr response time) | ||||||
135 | Director of CIS | ||||||
136 | Director of Physical Plant | ||||||
137 | Director of Risk Management | ||||||
138 | Director of Engineering & Planning | ||||||
139 | Director of University Police | ||||||
140 | Executive Director of Facilities | ||||||
Y | 141 | Final Project Close-Out | Completed? Yes/No/NA | Date | Entered By: | ||
142 | All punchlist items completed | ||||||
143 | Final Payments to Sub-Contractors | ||||||
144 | Release of Liens | ||||||
145 | Engineer/Architect letter of acceptance | ||||||
146 | Report of Final Acceptance | C-13b | |||||
147 | CIP Closeout Report Filed (Date) | ||||||
148 | |||||||
Y | 149 | Contract Close-Out | Completed? Yes/No/NA | ||||
150 | Construction costs distributed by FAMIS Code | C-30 | |||||
151 | attach | ||||||
152 | Verify project total amounts match pay requests | ||||||
153 | |||||||
154 | Verify all accounts included | ||||||
155 | Copy of FAMIS breakouts to Property Management | ||||||
156 | |||||||
157 | Final Change Order and Adjustments | ||||||
158 | Final Payment Authorization | C-19 | |||||
159 | Terms: | ||||||
160 | |||||||
161 | A/E - Architect or Engineer | JOC - Job Order Contract | |||||
162 | ADA - Americans with Disabilities Act | O&M - Operation and Maintenance | |||||
163 | CIS - Computer Information System | P Doc - Purchase Order | |||||
164 | CMR - Construction Manager at Risk | PM - Project Manager | |||||
165 | CSP - Competitive Sealed Proposal | POR - Program of Requirements | |||||
166 | DB - Design Build | R Doc - Requisition Order | |||||
167 | ESBD - Electronic State Business Daily | SSGS - Strategic Sourcing and General Services | |||||
168 | FAMIS - Financial Accounting Management Information System | TDH - Texas Department of Health | |||||
169 | HSP - HUB Sub Plan | TDLR - Texas Department of Licensing and Regulation | |||||
170 | HUB - Historically Underutilized Business | VPFA - Vice President for Finance and Administration | |||||
171 | |||||||
172 | |||||||
173 | Footnotes: | ||||||
174 | |||||||
175 | Project Number must be inserted as User Ref: on all Requistions | ||||||
176 | Scope of Design and Work; Budget; and Schedule | ||||||
177 | Job Order Contract and Design Build have additional items for review on the next tab | ||||||
178 | Uniform document for state projects >$25,000 | ||||||
179 | Document stating any changes in policy to the Uniform General Conditions | ||||||
180 | Documents specific to a project | ||||||
181 | Notification Letter must requests insurance, bonds, and pre-construction date. Signed C-10 and 3-copies of contract attached | ||||||
182 | 3- Copies Attached with Notification Letter | ||||||
183 | Copies to Contractor, Procurement, and Project Manager | ||||||
184 | Before final completion, owner may occupy | ||||||
185 | National Fire Prevention Association Inspection | ||||||
186 | Texas Department of Licensing and Regulation (Boilers, Elevators, etc…) | ||||||
187 | Texas Department of State Health Services | ||||||
188 | Add additional rows if there are multiple Inspections Reports or list a directory where they can be found. | ||||||
189 | Add additional rows if there are multiple Payment Applications or list a directory where they can be found. | ||||||
190 | Add additional rows if there are multiple Change Orders or list a directory where they can be found. | ||||||
191 | TDLR inspection to be done before Final Project Closeout. | ||||||
Y | CIS Considerations | Completed? Yes/No/NA | Date | Entered By: | |||
Locate underground cable (fiber, telephone, etc.,) | |||||||
Cable route from building to network infrastructure | |||||||
Cable requirements (CAT6, fiber, telephone) | |||||||
Card reader requirements | |||||||
Video surveilance requirements | |||||||
Multimedia rooms (audio, visual) | |||||||
Computer labs | |||||||
TTVN Room | |||||||
Network equipment (wired, wireless) | |||||||
Emergency notification system | |||||||
Kiosk | |||||||
Telecom requirements (MDF, IDF) |