242x Filetype XLS File size 0.49 MB Source: www.nps.gov
Sheet 1: Instructions
NPS Project Sustainability Checklist Building and Non Building Projects (For New Construction or Renovation) LEED 2009 Edition INSTRUCTIONS |
|||||||||||||||
1 | This checklist is organized around the LEED NC v3, 2009 checklist and also accounts for progress in meeting federal sustainability requirements (Guiding Principles). | ||||||||||||||
2 | To complete the checklist fill in all the blank cells under the column for the relevant submission responding with a Y, N or (in some cases) NA and a concise explanation of how the credit/regulation is or is not met. Copy to the next deliverable column unchanged answers for a particular sustainability feature. The purpose of this checklist is first and foremost to record whether sustainability features are included. Therefore it is not sufficient to indicate that a feature is not in the (design or construction) contract. The response should indicate whether this project does include the feature at the particular deliverable stage, and if so, how. | ||||||||||||||
3 | Sustainability features highlighted in yellow are federal requirements (links to the federal requirements are provided) for all new building projects and major renovations, regardless of size. All federal requirements must be met for all new buildings and major building renovations. For building renovation projects which cost less than 50% of the current replacement value of the building, the project must only comply with those federal requirements applicable to the planned work. | ||||||||||||||
4 | Compliance with ALL five Guiding Principles is required for a building to be considered in compliance. Projects that meet all the certification requirements of LEED at any of the four levels may not necessarily be compliant with the Guiding Principles. | ||||||||||||||
5 | This form automatically counts LEED NC credits. As the result, if any LEED prerequisite is not met, the LEED-NC score (located near the top of the checklist) will indicate "Missed Prereq." regardless of the other LEED NC credits achieved. | ||||||||||||||
6 | Sustainability features that are federal requirements, but have no parallel LEED credit, are identified at the left with green. Clicking the green cell will automatically navigate to the originating federal regulation. | ||||||||||||||
7 | All Sustainable features indicated with a LEED credit (i.e. SS Credit 2 or EA Credit 3) have defined prescriptive requirements that are indicated in , LEED Reference Guide for Green Building Design and Construction, ©2009 USGBC | ||||||||||||||
8 | For non-building projects use this same checklist. For federal requirements that don't apply to this non-building project, indicate with NA. Non building projects are defined as construction projects that do NOT include the construction of a building. Examples may include trailside parking, utility line, and road projects. | ||||||||||||||
ADD information regarding maybe's |
no reviews yet
Please Login to review.