178x Filetype XLS File size 0.05 MB Source: www.loudounwater.org
Checklist for Construction Plans PROJECT NAME:________________________________________________________ ID#___________________ Note: This checklist is provided for the convenience of design firms, so that the most common errors and omissions may be avoided. Refer to Loudoun Water's Engineering Design Manual for complete discussion of design requirements and parameters. PLEASE DO NOT INCLUDE THIS FORM WITH YOUR APPLI DATES: 1st Sub._____________________ 2nd Sub. _____________________ 3rd Sub. ___________________ Cover Sheet and General 1st sub. 2nd sub. Loudoun Water Project ID Blank Engineer's Seal, Signiture and Date Accurate Sheet Index Loudoun Water revision block, every applicable sheet Standard Notes (G-5 within the Standard Details) fully legible All and only applicable series from the Standard Details included in plan set Standard Details provided are current Design follows applicable basis of design, preliminary plat, and/or master plans Facilities sized correctly Adjoining work by other plans shown and up to date; plan names referenced Existing conditions and utilities shown Coordinate system and vertical datum identified CAD files for use in Loudoun Water GIS Required Not Required Bond Estimate May Omit Required Plan View - General 1st sub. 2nd sub. North arrow and minimum three grid tics per sheet Adequate separation between water and sanitary sewer, and with other utilities Pipes a minimum 15' from buildings Service connection for each building (water and sewer) Easements shown for utilities outside of public right of way Easements unencumbered and accessable for traverse Landscaping outside of Loudoun Water easements Limits of pre-blast clearly specified, where appropriate Access to utilities provided to adjoining properties Profile - General 1st sub. 2nd sub. Utility crossings shown with accurate clearances specified Profiles of existing utilities provided if impacted by proposed grading Engineering Design Manual, Appendix A Checklist for Construction Plans Page 1 of 6 October 2016 Water - Plan View 1st sub. 2nd sub. Min. 300' radius for pipe 12" and smaller, bends required otherwise Min. 500' radius for pipe 16" and larger, bends required otherwise Bends shown at accurate angles ± 3° Separation from sewer, curb, drains, and structures Dead-end line less than 500' for 8" and larger, 300' for 6" Adequate hydrant coverage to all structures All permanent terminations by means of a hydrant Air release valves specified at significant high points of 16" and larger pipes Hydrants at appropriate spacing and at substantial high and low points Line anchor and blow-off valve provided where future extension needed Valve between service connection and blow-off valve in temporary terminus Valving at appropriate intervals and configurations Fire hydrant min. 50' from commercial/industrial building Fire hydrant is maximum 100' from siamese connection Fire service independent with anchored branch valve (6" min.) at main Meter crocks 5' from driveway apron and fire hydrants Load letter and meter sizing; coordinate plumbing concerns Water - Profile 1st sub. 2nd sub. Proper cover specified (based on diameter) and minimized as practical All fittings, valves and hydrants called out and stationed Vertical curvature within limits of joint deflection (based on diameter) 16" and larger pipes have air release valves at substantial high points Hydrants at substantial low points Controlled fill specified where pipe is above existing grade Engineering Design Manual, Appendix A Checklist for Construction Plans Page 2 of 6 October 2016 Sewer - Plan View 1st sub. 2nd sub. Manhole placement conforms to street design; manholes minimized Manholes provided where future extensions are anticipated Minimum 90° between incoming and outgoing pipes at manhole Within maximum length between manholes (based on diameter) Adequate angle to provide separation between pipe penetrations at manhole System extends beyond waterline improvements Pre-blast for future extension from manhole; show possible future bearings No doghouse manholes; must be cut in Sewer - Profile 1st sub. 2nd sub. All invert information shown on maholes, including laterals entering manhole Invert elevation of existing sewer based on field survey Length, slope, and diameter of sewer shown, accurate, matching plan view Minimum slopes provided (based on diameter) Twice minimum slope on permanent terminal run Cover on pipe is within standards Adeqaute protection provided for stream crossings Drop across manholes: 0.2' desired; 0.1' minimum; pipe crowns match or better Maximum invert difference at manhole is 0.5' Ensure that future extensions can cross adjacent stream Top of manhole is 1' above grade if beyond right of way and developed lawns Water-tight cover specified if manhole is below 100-year storm elevation Vents provided where necessary. Specify heavy duty frame and cover where manhole is in future pavement Lining of manholes specified where appropriate Specify type of pipe for existing and proposed sewers Diameter of manholes specified if larger than 48" Sanitary Laterals 1st sub. 2nd sub Laterals enter sewer at 90° Laterals end one foot beyond Common Shared Easement (CSE) Profile or table provided Minimum riser height three feet Invert information correct, including laterals entering manhole Stations and lengths match plan view Risers start out of right of way and end a minimum 5' from end of lateral Lowest floor elevation in each building listed Clean out added for laterals more than 100' Commercial/industrial - clean out 5' from building wall Pretreatment devices specified where applicable Engineering Design Manual, Appendix A Checklist for Construction Plans Page 3 of 6 October 2016 Checklist for Construction Plans PROJECT NAME:________________________________________________________ ID#___________________ Note: This checklist is provided for the convenience of design firms, so that the most common errors and omissions may be avoided. Refer to Loudoun Water's Engineering Design Manual for complete discussion of design requirements and parameters. PLEASE DO NOT INCLUDE THIS FORM WITH YOUR APPLI DATES: 1st Sub._____________________ 2nd Sub. _____________________ 3rd Sub. ___________________ 3rd sub. Not Required Required 3rd sub. 3rd sub. Engineering Design Manual, Appendix A Checklist for Construction Plans Page 4 of 6 October 2016
no reviews yet
Please Login to review.