Infrastructure investment and government construction pipeline spreadsheet
This workbook contains infrastructure investment and government construction pipelines that have
been compiled by the Government.
These infrastructure investment and government construction pipelines have been collated
within the Government with the intention of publication to provide industry with greater
visibility over the future pipeline of Government funded construction projects, wider
regulated and private sector infrastructure. The pipeline is based on unaudited
administrative data and should not be considered as national statistics or as official statistics.
The data is owned by Departments or the Companies that provided it. Anyone using these
pipelines does so at their own risk and no responsibility is accepted by HM Governement
for any loss or liability which may arise from such use directly or indirectly. In preparing and
collating this Construction and Infrastructure Pipeline commercially sensitive information has
been removed for reasons of confidentiality.
Use the tabs below to navigate the workbook
HM Treasury November 2011
Infrastructure investment pipeline data - notes
The Government has published, for the first time, infrastructure investment pipeline data. This data
covers over 500 projects and programmes across both the public and private sectors.
The infrastructure investment pipeline estimates are indicative and reflect the information held within
Government on infrastructure investment combined with other public sources of information. Data
about purely private investment is subject to greater uncertainty than that for public sector or regulated
investment. To enable analysis, some observations have been estimated to provide annual breakdowns
of totals and to fill gaps in the information available. The pipeline data is not comprehensive but reflects
the best information available to Government. Projects under £50 million are not included to focus on
significant investment. In addition no information on local infrastructure projects that are not funded
directly by central Government is available.
Public funding for projects beyond 2015 is in general not confirmed. Economically regulated investment
in energy and water networks is also not generally confirmed beyond currently determined regulatory
periods. The pipeline data are designed to provide a sense of the scale of investment that is expected
but should not be taken as a commitment in each and every case.
The data includes information on project / programme name, location, ownership, funding and costs.
The infrastructure investment pipeline data will be refreshed annually.
Electricity generation data and cost estimates
The pipeline information for electricity generation is particularly uncertain. National Grid data are
included on projects that have agreements to connect to the grid in place. Market intelligence suggests
that up to 50 per cent of these projects will not be taken forward, for example because the demand for
power does not warrant the particular project being built or the economics of a particular project are
not favourable or there are problems with obtaining planning consents. Cost estimates are therefore
provided as HM Treasury estimates by fuel type that allow for the expected proportion of projects that
should proceed. These use the National Grid TEC data combined with estimated capital costs per unit of
output for a generic plant, high level construction time estimates and estimates drawn from market
intelligence on the proportion of projects that will proceed.
Project timings represent the earliest possible date for connection to the grid. In reality investment is
likely to take place over a longer timeframe, reflecting the complexity of major infrastructure projects,
market demand and developer's commercial considerations.
These estimates are indicative and designed to provide a sense of the potential scale of investment. The
Government's statement of the investment that is needed in terms of generating capacity is set out in
the energy National Policy Statements that inform the major infrastructure planning system
HM Treasury November 2011
Explanation of data fields and definitions
Departments were asked to provide project / programme level responses to the questions set out below
in a spreadsheet template, using the following guidance.
Description
Sector / sub-sector / sub-group Select a ‘sector’ from the drop-down list, then if
applicable, specify further using the ‘sub-sector’ and
‘sub-group’.
Project / programme name This should show where part of a wider programme,
or the balance of a programme from which specific
projects are reported separately
Description / purpose Including number of projects that are being reported
on (where relevant)
Location Where the project / programme is located.
Region Select from the drop-down boxes: an English region;
a nation within the UK; or UK-wide
Postcode / Grid Reference To further assist with locating the project /
programme. It is appreciated that many projects
cannot be identified by a single point so either: pick
a central point, an important/control point, or
include multiple points (such as end-points).
Asset Ownership Select from the drop-down options. This is regarding
the ultimate ownership of the asset, not the origins of
the funding nor the status of the delivery body.
If ownership is complex, select the most appropriate
response then include in the “notes” section a
description of the ownership position e.g. where
ownership will revert from private to public in the
future
Economically regulated investment Yes / no (generally relevant to infrastructure only)
Funding Source(s) Public / private / combination
Scheme Status Proposed / planned / confirmed / started (see
definitions below)
Timing
Earliest Construction Start Date Please describe in the most appropriate fashion,
depending on factors such as certainty e.g. “October
st
1 2011” could be fairly certain but if in 2014, no more
detail than “2014” would be appropriate. Descriptions
such as “After 2014” are also acceptable.
HM Treasury November 2011
Date in service When will the asset become available to the user?
Please respond in a similar fashion to above.
On schedule Yes / no / unknown
If on track to meet planned dates for construction /
service
Costs
Total capex cost all funding (£m) Likely to be total nominal capex – depending on
information that is available. Provide details of the
cost information in the “cost status” or “notes” fields.
Total capex cost publicly funded, if Total public investment / support (where relevant).
different (£m) Focus on CDEL unless alternate measure more
appropriate (e.g. CDEL+RDEL). Other information, e.g.
PFI credits can be provided separately if available.
Costs per year (£m) Capital value, for each year from 2011/12 to 2014/15
Costs 2015 to 2020 (£m) Capital value
Costs beyond 2020 (£m) Capital value for known, longer-term projects /
programmes
Estimate status Status of the cost information that has been reported.
Pre-project / Concept / Pre-procurement / Bid price /
Completed cost
Basis of costs, base year State whether cost values are Nominal or Real. State
the base year.
Non-construction Costs Where the “total cost all funding” is not equal to
construction costs, please give detail of the non-
construction costs in the relevant columns, adding
· Significant land detail in the “notes” column if necessary.
related costs (£m)
· Finance costs where
privately funded e.g. PFI
(£m)
· FM or other
significant ‘non-
construction’ related costs
(£m)
Procurement Route
Planned Procurement Route Please select from the drop-down box. If complex,
select “other” then give details in the “notes” column.
Expiry Date for Existing Frameworks If procurement is expected to be through frameworks,
when do these expire?