level 2 design guidance data rev 2 document vsy a02 01 0006 agreement not protectively marked data item description level 2 design guidance data did e003 prepared by vancouver shipyards ...

icon picture DOC Filetype Word DOC | Posted on 30 Jul 2022 | 3 years ago
Partial capture of text on file.
                                                                          Level 2 Design Guidance Data, Rev 2                          Document #: VSY-A02.01-0006
                                                                                                                                  Agreement #: [* insert Agreement #]
                                                                                                                                 NOT PROTECTIVELY MARKED
                                                           Data Item Description
                                             Level 2 Design Guidance Data
                                                                               DID E003
                      Prepared by:     Vancouver Shipyards Co. Ltd.
                                       2 Pemberton Ave.
                                       North Vancouver, BC, Canada, V7P 2R2
                                       Tel:  (604) 988-3111
                                       Fax: (604) 984-1636
                      © Vancouver Shipyards Co. Ltd. 2016
                                                                                       Unclassified                                                       Page 1 of 3
                                                                                 Uncontrolled when Printed
                      Purchaser’s initials: _____                   See disclosure statement on front page of the Subcontract                   Supplier’s initials: _____
                                                                          Level 2 Design Guidance Data, Rev 2                          Document #: VSY-A02.01-0006
                                                                                                                                  Agreement #: [* insert Agreement #]
                                                                                                                                 NOT PROTECTIVELY MARKED
                      PURPOSE
                      Level 2 Design Guidance Data is required to enable the final design of the Ship to proceed.
                      SCOPE
                      Information as required below .
                      REFERENCES
                      This DID must be read in conjunction with Part 3 (Engineering) of Schedule D1 (SOW).
                      PREPARATION INSTRUCTIONS
                      The supplier shall provide a DID Compliance Matrix indicating which submission files contain the items listed in this DID.
                      For written style documents (eg. manuals, performance specification documents, etc) larger than 10 pages the document shall include
                      a Table of Contents that contains links to the various section headers within the document.
                      CONTENT AND FORMAT
                      All physical parameters quoted at this stage are to be the actual final design standard.
                      Level 2 Design Guidance Data includes, where applicable:
                      (a)        Update to all information and Equipment Specification Table entries provided in SDRLs E001 and E002 and DIDs E001 and
                                 E002. Note, if a piece of information is not updated in this submittal it is by default implied to be “the actual final design
                                 standard” per the statement above.
                      (b)        All Connection Data, to enable connectors to be made up, without additional information (e.g. from third party connector
                                 manufacturers).  As a minimum this data must include:
                                 (i)        preparation of cable cores, screens and insulation
                                 (ii)       screen termination definition and procedures
                                 (iii)      core termination procedures
                                 (iv)       heat-shrink boot fitting procedures
                      (c)        A comprehensive list of cable and connection tools necessary for correct installation of mating connectors and backshells or
                                 heat shrink glands and boots.  The list is to include all necessary crimping, insertion and extraction tools, and must highlight
                                 tools peculiar to one particular cable/connector type or manufacturer.
                      (d)        Any specialised technical information not already included in SDRL’s E001 and E002.
                      STRUCTURE
                      Separate file submission where appropriate (eg. Where the information requested does not reside as part of an interconnectivity
                      diagram or the Equipment Specifications Table).
                                                                                       Unclassified                                                       Page 2 of 3
                                                                                 Uncontrolled when Printed
                      Purchaser’s initials: _____                   See disclosure statement on front page of the Subcontract                   Supplier’s initials: _____
                                                                          Level 2 Design Guidance Data, Rev 2                          Document #: VSY-A02.01-0006
                                                                                                                                  Agreement #: [* insert Agreement #]
                                                                                                                                 NOT PROTECTIVELY MARKED
                      SPECIAL INSTRUCTIONS
                      Supplier must provide an update to information provided with SDRLs E001 and E002 and DIDs E001 and E002 where applicable.
                      Changes to the information provided must be clearly identified.
                      Information that pertains to physical dimensions and arrangements shall be provided in AutoCAD format (.dwg).
                                                                                       Unclassified                                                       Page 3 of 3
                                                                                 Uncontrolled when Printed
                      Purchaser’s initials: _____                   See disclosure statement on front page of the Subcontract                   Supplier’s initials: _____
The words contained in this file might help you see if this file matches what you are looking for:

...Level design guidance data rev document vsy a agreement not protectively marked item description did e prepared by vancouver shipyards co ltd pemberton ave north bc canada vp r tel fax unclassified page of uncontrolled when printed purchaser s initials see disclosure statement on front the subcontract supplier purpose is required to enable final ship proceed scope information as below references this must be read in conjunction with part engineering schedule d sow preparation instructions shall provide compliance matrix indicating which submission files contain items listed for written style documents eg manuals performance specification etc larger than pages include table contents that contains links various section headers within content and format all physical parameters quoted at stage are actual standard includes where applicable update equipment entries provided sdrls dids note if piece updated submittal it default implied per above b connection connectors made up without additio...

no reviews yet
Please Login to review.