jagomart
digital resources
picture1_Construction Template Excel 20356 | Kategori 8 Manajemen Proyek Dan Manajemen Perawatan


 330x       Tipe XLSX       Ukuran file 0.03 MB       Source: expertindo-training.com


Construction Template Excel 20356 | Kategori 8 Manajemen Proyek Dan Manajemen Perawatan

icon picture XLSX Excel XLSX | Diposting 25 Jul 2022 | 4 thn lalu
Berikut sebagian screen capture file ini. Geser ke kiri pada layar.
                                             KATEGORI 8: MANAJEMEN PROYEK & MANAJEMEN PERAWATAN
           NO   KODE                              JUDUL TRAINING
            1   PM-001 AHLI DESAIN TEROWONGAN (TUNNEL DESIGN ENGINEER)
            2   PM-002 AHLI JAMINAN MUTU PEMANFAATAN BANGUNAN
                PM-003 AHLI K 3 KONSTRUKSI
            3
            4   PM-004 AHLI PENGAWASAN PEKERJAAN JEMBATAN
            5   PM-005 AHLI PERENCANAAN UMUM JALAN
            6   PM-006 AHLI PERKIRAAN BIAYA JEMBATAN
            7   PM-007 AHLI STRUKTUR KONSTRUKSI JEMBATAN
            8   PM-008 AHLI TEKNIK DESAIN JALAN (ROAN DESIGN ENGINEER)
            9   PM-009 ANALISIS DAN DESAIN STRUKTUR MENGGUNAKAN ETABS
           10   PM-010 ANALISIS HARGA SATUAN
           11   PM-011 APPLIED RISK ASSESSMENT INTO EPC PROJECT  
           12   PM-012 AUDIT HASIL PEKERJAAN KONSTRUKSI
                PM-013 BEST PRACTISE IN QUALITY ASSURANCE UNTUK PENYUSUNAN RENCANA MUTU 
           13          KONTRAK KONSTRUKSI
           14   PM-014 BUILDING MANAGEMENT
           15   PM-015 BUILDING SUPERVISION AND QUALITY CONTROL OF CIVIL WORK
                PM-016
           16          CLOSING AND HANDOVER PROJECT (PENUTUPAN DAN SERAH TERIMA PROYEK)
           17   PM-017 CONSTRUCTION METHODS AND CONSTRUCTION MANAGEMENT
           18   PM-018 DASAR-DASAR MANAJEMEN PROYEK
           19   PM-019 DASAR-DASAR MANAJEMEN PROYEK
           20   PM-020 FEED (Front End Engineering Design) Projec Control.
           21   PM-021 FINANCING ENERGY PROJECT & PROJECT STRUCTURING 
           22   PM-022 FLIGHT OPERATION OFFICER
           23   PM-023 GREEN BUILDING CONCEPT
           24   PM-024 LANDSCAPE DAN PERTAMANAN 
           25   PM-025 MANAGING PROJECT EPC CONTRACT FOR SUCCESSFUL OIL AND GAS PROJECT
                PM-026 MANAJEMEN FASILITAS DAN KESELAMATAN  BANGUNAN GEDUNG DAN FASILITAS   
           26          RUMAH SAKIT 
           27   PM-027 MANAJEMEN INFRASTRUKTUR
                PM-028 MANAJEMEN PERAWATAN BANGUNAN GEDUNG DAN FASILITAS
           28
                PM-029 Manajemen Perawatan Gedung & Fasilitas Dan Audit/manajemen energi Listrik Serta 
           29          Safety Pencegahan Terhadap Bahaya Kebakaran Di Gedung
           30   PM-030 MANAJEMEN PROYEK  STRATEGI SUKSES DAN IMPLEMENTASI
                PM-031 MANAJEMEN PROYEK IT
           31
           32   PM-032 MANAJEMEN PROYEK KONSTRUKSI
                PM-033 MANAJEMEN PROYEK KONSTRUKSI DAN PEMELIHARAAN GEDUNG (BUILDING 
           33          MAINTENANCE)
           34   PM-034 Master Project Manager
           35   PM-035 MATERIAL MANAGEMENT FOR PROJECT
           36   PM-036 MERANCANG BANGUNAN GEDUNG DENGAN SKETCH UP
                PM-037 PELATIHAN PEMBINAAN INSINYUR DAN SERTIFIKASI INSINYUR PROFESIONAL
           37
           38   PM-038 PENDIRIAN POLIKLINIK DAN RUMAH SAKIT KONSEP & APLIKASI
           39   PM-039 PENGAWASAN BANGUNAN GEDUNG (BUILDING SUPERVISION)
           40   PM-040 PENGENDALIAN MUTU DAN ASPEK HUKUM PADA PROYEK KONTRUKSI
                PM-041 PENYUSUNAN ANGGARAN PERAWATAN BANGUNAN GEDUNG DAN FASILITAS
           41
           42   PM-042 PENYUSUNAN KAJIAN TEKNIS BANGUNAN UNTUK SERTIFIKAT LAIK FUNGSI (SLF)
           43   PM-043 PENYUSUNAN RENCANA ANGGARAN BIAYA UNTUK PROGRAM KEMITRAAN BINA LINGKU
           44   PM-044 PLAXIS 2D BASIC TO INTERMEDIATE
           45   PM-045 PROJECT CONTROL MANAGEMENT
           46   PM-046 PROJECT COST MANAGEMENT
           47   PM-047 PROJECT EXECUTION & MANPOWER MOBILITATION
           48   PM-048 PROJECT FEASIBILITY STUDY
           49   PM-049 Project Financing
           50   PM-050 Project Financing For Oil and Gas
           51   PM-051 PROJECT MANAGEMENT (MANAJEMEN PROYEK)
           52   PM-052 PROJECT MANAGEMENT (PM)
           53   PM-053 PROJECT MANAGEMENT DENGAN MICROSOFT PROJECT
           54   PM-054 PROJECT MANAGEMENT DENGAN PRIMAVERA
           55   PM-055 PROJECT MANAGEMENT FOR ENGINEERING AND CONSTRUCTION
           56   PM-056 PROJECT MANAGEMENT FOR NON PROJECT MANAGER
           57   PM-057 PROJECT MANAGEMENT IN ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC)
           58   PM-058 PROJECT MANAGEMENT OFFICE (PMO)
           59   PM-059 Project Manager
           60   PM-060 PROJECT MONITORING AND EVALUATION
           61   PM-061 PROJECT RISK MANAGEMENT WITH MONTECARLO ANALYSIS
           62   PM-062 PROJECT SCHEDULING
           63   PM-063 PROJECT TIME MANAGEMENT (PTM)
                PM-064 QUALITY ASSURANCE FOR ENGINEER
           64
                PM-065 QUALITY CONTROL OF CIVIL WORK (PENGENDALIAN MUTU PADA PROYEK 
           65          KONSTRUKSI)
           66   PM-066 QUANTITY SURVEYOR
           67   PM-067 RENCANA KERJA DAN ANGGARAN PERUSAHAAN
           68   PM-068 SAP 2000 & TEKLA For Analysist Structure
           69   PM-069 SAP 2000 DAN TEKLA
           70   PM-070 SILABUS PELATIHAN KELAYAKAN INVESTASI
           71   PM-071 STUDI KELAYAKAN PROPERTI
           72   PM-072 System Dynamics Dengan STELLA
           73   PM-073 TEAM BUILDING
           74   PM-074 TEKNIK PENYUSUNAN ANGGARAN PROYEK
           75   PM-075 TEKNIK PENYUSUNAN HPS
           76   PM-076 VALUE ENGINEERING
           77   PM-077 SISTEM PENYEDIAAN AIR MINUM
           78   PM-078 STRUKTUR KAYU DAN BAMBU
           79   PM-079 Penilaian Properti Komersial - Hotel, Retail,dll
           80   PM-080 IR. Rini Darmastiti,MSC,Phd
           81   PM-081 TEKNIK PENYUSUNAN SOP SATUAN PENGAMANAN
           82   PM-082 Maintenance Untuk High Rise
           83   PM-083 MENCEGAH KECELAKAAN KERJA PADA PROYEK KONSTRUKSI
           84   PM-084 Pelatihan Analisa Harga Satuan SNI untuk Rencana Anggaran Biaya
           85   PM-085 PENGAWASAN PEKERJAAN KONSTRUKSI DI LAPANGAN DAN FORENSIC ENGINEERING 
           86   PM-086 PILE FOUNDATION
           87   PM-087 PLAXIS 2D
           88   PM-088 SOIL MECHANICS, THEORY & APPLICATION
           89   PM-089 TEKNIK PEMETAAN DAN SURVEY LAPANGAN PADA BIDANG KONSTRUKSI
           90   PM-090 Training Basic Bangunan dan Pekerjaan Bangunan
           91   PM-091 Training Basic Land Preparation
           92   PM-092 Training Basic Perancangan Perkerasan Jalan
           93   PM-093 Training Asuransi Pembangunan Kapal – Hull & Machinery and Protection & Indemnity
           94   PM-094 ANALISIA UJI STRUKTUR BANGUNAN GEDUNG
           95   PM-095 CONSTRUCTION MANAGEMENT OIL & GAS
           96   PM-096 Contractor & Stakeholder Management
           97   PM-097 Structural Design of Industrial Facilities
           98   PM-098 Insurance & Claim ( Marine, Freight Forwading & Port Infrastructur)
KATEGORI 8: MANAJEMEN PROYEK & MANAJEMEN PERAWATAN
                                                                                                                                                Tahun 2020
                          LEAD INSTRUKTUR                           Januari                  Februari                            Maret
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE dan Drs.          6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Suharyana, M.Kes
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Wahyu Bintoro, ST, CIPM and Team               6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arief Ghzdewan,ST,MSCE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan, ST, MSCE and team        6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
                                                           6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
                                                           6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Dr. Ir. Fauzi Hasan. MM, MBA                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Dr. Ir. Fauzi Hasan. MM, MBA                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arief Ghzdewan,ST,MSCE , Ir. Surono.,    6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arief Ghzdewan,ST,MSCE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Team Instruktur Penerbangan                    6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Dr. Ir. H. Muslikh, M.Sc., M.Phil              6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Arief Heru Swasono IAI, IPM                    6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arief Ghzdewan,ST,MSCE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
                                                           6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif ghuzdewan,ST,MCSE dan Tugini ST MT
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
                                                           6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif ghuzdewan,ST,MCSE dan Tugini ST MT
                                                           6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Tugino, ST MT & Team
            Toriq Arief Ghzdewan,ST,MSCE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan,ST,MCSE dan Yuli Agusti   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Rochman, ST.,M.Eng
            Toriq Arif Ghuzdewan,ST,MCSE                   6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
                                                           6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Dr. Ir. Fauzi Hasan. MM, MBA
            American Academy Certified Consultant          6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Drs Miswanto,M.Si                              6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Toriq Arif Ghuzdewan, ST., MSCE                6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
                                                           6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Tim Instruktur Persatuan Insinyur Indonesia
            Drs H Moeljadi                                 6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
            Dr. Ir. H. Muslikh, M.Sc., M.Phil              6-8 13-15  20-22 27-29 3-5     10-12   17-19 26-28 2-4     9-11
Kata-kata yang terdapat di dalam file ini mungkin membantu anda melihat apakah file ini sesuai dengan yang dicari :

...Kategori manajemen proyek perawatan no kode judul training pm ahli desain terowongan tunnel design engineer jaminan mutu pemanfaatan bangunan k konstruksi pengawasan pekerjaan jembatan perencanaan umum jalan perkiraan biaya struktur teknik roan analisis dan menggunakan etabs harga satuan applied risk assessment into epc project audit hasil best practise in quality assurance untuk penyusunan rencana kontrak building management supervision and control of civil work closing handover penutupan serah terima construction methods dasardasar feed front end engineering projec financing energy structuring flight operation officer green concept landscape pertamanan managing contract for successful oil gas fasilitas keselamatan gedung rumah sakit infrastruktur auditmanajemen energi listrik serta safety pencegahan terhadap bahaya kebakaran di strategi sukses implementasi it pemeliharaan maintenance master manager material merancang dengan sketch up pelatihan pembinaan insinyur sertifikasi profesion...

no reviews yet
Please Login to review.