158x Filetype XLS File size 0.03 MB Source: ucanr.edu
Sheet 1: Lodi Worksheet
Sample Irrigation Scheduling Worksheet - Lodi, CA | |||||||||||||||||||||
ETo and precipitation are the averages of daily data from 1984 to 2003. | |||||||||||||||||||||
Data from the Lodi (CIMIS #42) and West Lodi (#166) weather stations | |||||||||||||||||||||
Formulas are all present; simply input your numbers in the blue-colored columns. | |||||||||||||||||||||
Assumptions | |||||||||||||||||||||
1. Leaf Water Potential trigger was reached July 8th. | |||||||||||||||||||||
2. Harvest Date was October 1. | |||||||||||||||||||||
Date | A = Historical Etoa | B = Crop Coefficientb | C = A x B: Potential Water Use | D = RDI Coefficientc | E = Soil Contribution | F = Effective Rainfalld | G = [(C x D) - E - F]: Net Irrigation Requirement | H = Emission Uniformitye | I = G/H:Gross Irrigation Amount | J = Vine Spacingf | K = (I x J x .623): Gallons per Vine/ Period | L = Average Application Rate | M = (K/L): Hours of PREDICTED Irrigation Time | ||||||||
Period | Inches/Period | Kc | (in) | RDI % | (in) | (in) | (in) | (%) | (in) | (sq feet) | (gal/week) | (gph/vine) | (hours) | ||||||||
Jly 8-14 | 1.82 | 0.68 | 1.24 | 0.5 | 0.2 | 0 | 0.42 | 92 | 0.45 | 77 | 21.8 | 0.96 | 22.7 | ||||||||
Jly 15-21 | 1.720 | 0.68 | 1.17 | 0.5 | 0.2 | 0 | 0.38 | 92 | 0.42 | 77 | 20.1 | 0.96 | 20.9 | ||||||||
Jly 22-28 | 1.692 | 0.68 | 1.15 | 0.5 | 0.2 | 0 | 0.38 | 92 | 0.41 | 77 | 19.6 | 0.96 | 20.4 | ||||||||
Jly 29 to Aug 4 | 1.676 | 0.68 | 1.14 | 0.5 | 0.2 | 0 | 0.37 | 92 | 0.40 | 77 | 19.3 | 0.96 | 20.1 | ||||||||
Aug 5-11 | 1.626 | 0.68 | 1.11 | 0.5 | 0.2 | 0 | 0.35 | 92 | 0.38 | 77 | 18.4 | 0.96 | 19.2 | ||||||||
Aug 12-18 | 1.556 | 0.68 | 1.06 | 0.5 | 0.2 | 0 | 0.33 | 92 | 0.36 | 77 | 17.2 | 0.96 | 17.9 | ||||||||
Aug 19-25 | 1.494 | 0.68 | 1.02 | 0.5 | 0.2 | 0 | 0.31 | 92 | 0.33 | 77 | 16.1 | 0.96 | 16.7 | ||||||||
Aug 26 to Sept 1 | 1.448 | 0.68 | 0.98 | 0.5 | 0.2 | 0 | 0.29 | 92 | 0.32 | 77 | 15.2 | 0.96 | 15.9 | ||||||||
Sept 2-8 | 1.368 | 0.68 | 0.93 | 0.5 | 0.2 | 0 | 0.27 | 92 | 0.29 | 77 | 13.8 | 0.96 | 14.4 | ||||||||
Sept 9-15 | 1.225 | 0.68 | 0.83 | 0.5 | 0.2 | 0 | 0.22 | 92 | 0.24 | 77 | 11.3 | 0.96 | 11.8 | ||||||||
Sept 16-22 | 1.171 | 0.68 | 0.80 | 0.5 | 0.2 | 0 | 0.20 | 92 | 0.22 | 77 | 10.3 | 0.96 | 10.8 | ||||||||
Sept 23-29 | 1.054 | 0.68 | 0.72 | 0.5 | 0.2 | 0 | 0.16 | 92 | 0.17 | 77 | 8.3 | 0.96 | 8.6 | ||||||||
Sept 30 to Oct 6 | 0.974 | 0.68 | 0.66 | 1 | 0 | 0.66 | 92 | 0.72 | 77 | 34.5 | 0.96 | 36.0 | |||||||||
Oct 7-13 | 0.883 | 0.68 | 0.60 | 1 | 0 | 0.60 | 92 | 0.65 | 77 | 31.3 | 0.96 | 32.6 | |||||||||
Oct 14-20 | 0.779 | 0.68 | 0.53 | 1 | 0 | 0.53 | 92 | 0.58 | 77 | 27.6 | 0.96 | 28.8 | |||||||||
Oct 21-27 | 0.660 | 0.68 | 0.45 | 1 | 0 | 0.45 | 92 | 0.49 | 77 | 23.4 | 0.96 | 24.4 | |||||||||
Oct 28 to Nov 3 | 0.540 | 0.68 | 0.37 | 1 | 0.32 | 0.05 | 92 | 0.05 | 77 | 2.4 | 0.96 | 2.5 | |||||||||
Total | 14.75 | 2.40 | 5.96 | 6.47 | |||||||||||||||||
a http://wwwcimis.water.ca.gov/cimis or | http://ucipm.ucdavis.edu | ||||||||||||||||||||
b Crop Coeficient calculated based on 40% midday land surface shaded (0.68) | Gallons per vine applied though harvest = | 191.3 | |||||||||||||||||||
c Regulated Deficit is 50% (0.5) | Hours of irrigation time through harvest = | 199.3 | |||||||||||||||||||
d Effective rainfall is calculated from actual rainfall. Calculations are not shown on this sheet. | |||||||||||||||||||||
e Under deficit irrigation, Irrigation Efficiency is assumed equal to Emission Uniformity. | |||||||||||||||||||||
e spacing 7 x 11 ft = 77 ft sq. | |||||||||||||||||||||
no reviews yet
Please Login to review.