217x Filetype PPTX File size 1.11 MB Source: indico.fnal.gov
General Outline Scope, Interfaces, and External Dependencies Technical Status and Progress Procurement Status and Progress QA/QC Approved BCRs Schedule Cost and Schedule Performance & VAR Reports Estimate at Completion Risks ES&H Summary HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019 2 Charge 1 WBS 302.4.01: Scope and Interfaces From WBS Dictionary US-HiLumi-doc-39 Receive MQXFA magnet from LBNL Prepare magnet for test at 1.9K in vertical test cryostat Test magnet and analyze results Ship magnet to FNAL (for assembly into a cold mass) or to LBNL (for re- build if test failed) Deliverables: 22 magnet tests WBS scope is clearly defined and well understood. Interfaces are defined and controlled HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019 3 WBS 302.4.01: Scope and Interfaces Magnets Vertical Test (302.4.01) is a component of the overall work flow (US-HiLumi-doc-138) Vertical Test Stand Manufacturing Flow (BNL) Coil Parts (FNAL) Final Design Final Design Boxes with dashed lines ICBA New ICBA New IB1 Test are not part of AUP Building Building Stand (FNAL) (FNAL) (FNAL) Cryo - Cryo - Assembly Assembly Test HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019 4 WBS 302.4.01: Scope and Interfaces Interface Control Matrix is from: US-HiLumi-doc-219 US-HiLumi-doc-1151 US-HiLumi-doc-321 US-HiLumi-doc-207 Interfaces are defined and controlled. HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019 5 WBS 302.4.01: Organization US-HiLumi-doc-104 US HL-LHC Accelerator Upgrade Project: 302.4.01 Magnets Vertical Test Experienced Team: Joe Muratore Piyush Joshi Honghai Song Andy Marone Bill McKeon Frank Teich Sonny Dimaiuta Dan Sullivan WBS 302.4.01 team in John Cintorino place. There are clear roles Pat Doutney and responsibilities Pete Galioto HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019 6
no reviews yet
Please Login to review.