general outline scope interfaces and external dependencies technical status and progress procurement status and progress qa qc approved bcrs schedule cost and schedule performance var reports estimate at completion risks ...

icon picture PPTX Filetype Power Point PPTX | Posted on 01 Jul 2022 | 3 years ago
Partial capture of text on file.
                                       General Outline
         Scope, Interfaces, and External Dependencies
         Technical Status and Progress
         Procurement Status and Progress
         QA/QC
         Approved BCRs
         Schedule
         Cost and Schedule Performance & VAR Reports
         Estimate at Completion
         Risks
         ES&H
         Summary
                                                               HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019     2
                                                                                                      Charge 1
                    WBS 302.4.01: Scope and Interfaces
                                 From WBS Dictionary US-HiLumi-doc-39 
      Receive MQXFA magnet from 
       LBNL
      Prepare magnet for test at 1.9K in 
       vertical test cryostat
      Test magnet and analyze results
      Ship magnet to FNAL (for assembly 
       into a cold mass) or to LBNL (for re-
       build if test failed)
      Deliverables: 22 magnet tests
                     WBS scope is clearly defined and well understood. 
                     Interfaces are defined and controlled
                                                               HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019     3
                       WBS 302.4.01: Scope and Interfaces
         Magnets Vertical Test (302.4.01) is a component of the overall work flow
                                                 (US-HiLumi-doc-138)                                                 Vertical  
                                                                                                                     Test Stand
        Manufacturing Flow                                                                                           (BNL)
                                                                Coil Parts (FNAL) 
                                                                                                                 Final Design 
                                                                                                                 Final Design 
                                                                                                Boxes with dashed lines 
                            ICBA New                     ICBA New      IB1 Test                 are not part of AUP
                            Building                     Building      Stand
                            (FNAL)                       (FNAL)        (FNAL)
                                            Cryo -                    Cryo - 
                                           Assembly                Assembly Test
                                                                         HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019               4
                    WBS 302.4.01: Scope and Interfaces
       Interface Control Matrix is from: 
       US-HiLumi-doc-219
                                                                                             US-HiLumi-doc-1151
                                                                                              US-HiLumi-doc-321
                                                                                              US-HiLumi-doc-207
                                                     Interfaces are defined and controlled.
                                                               HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019     5
                        WBS 302.4.01: Organization
                                              US-HiLumi-doc-104
                        US HL-LHC Accelerator Upgrade Project: 302.4.01 Magnets Vertical Test
         Experienced Team:
         Joe Muratore
         Piyush Joshi
         Honghai Song
         Andy Marone
         Bill McKeon
         Frank Teich
         Sonny Dimaiuta
         Dan Sullivan                 WBS 302.4.01 team in 
         John  Cintorino              place. There are clear roles 
         Pat Doutney                  and responsibilities
         Pete Galioto
                                                               HL-LHC AUP IPR DOE/SC Review– Jan 14-16, 2019     6
The words contained in this file might help you see if this file matches what you are looking for:

...General outline scope interfaces and external dependencies technical status progress procurement qa qc approved bcrs schedule cost performance var reports estimate at completion risks es h summary hl lhc aup ipr doe sc review jan charge wbs from dictionary us hilumi doc receive mqxfa magnet lbnl prepare for test k in vertical cryostat analyze results ship to fnal assembly into a cold mass or re build if failed deliverables tests is clearly defined well understood are controlled magnets component of the overall work flow stand manufacturing bnl coil parts final design boxes with dashed lines icba new ib not part building cryo interface control matrix organization accelerator upgrade project experienced team joe muratore piyush joshi honghai song andy marone bill mckeon frank teich sonny dimaiuta dan sullivan john cintorino place there clear roles pat doutney responsibilities pete galioto...

no reviews yet
Please Login to review.